Developing Greenland’s rare earths and precious metals for the industries that depend on them.
GreenlandMines NASDAQ GRMLDeveloping Greenland’s rare earths and precious metals for the industries that depend on them.
GreenlandMinesThe portfolio / Nasdaq: GRMLNeodymium and praseodymium are central to the permanent magnets used in many electric drives and precision systems. Sarfartoq combines a defined rare-earth resource with a strategic relationship with Neo.
Company interest.
Neo’s offtake MOU remains in place.
Neo Performance Materials has an MOU to negotiate a definitive offtake agreement for up to 60% of future ore or mineral concentrate.3
A large layered intrusion hosting palladium, gold, and platinum. Historical drilling and the completed 2026 field program support the next phase of resource evaluation and processing studies.
Company interest.
Option for the remaining 20%.
Processing testwork and an Initial Assessment following the completed 2026 field program.1, 2
AnorTech: approximately 19.9%. A strategic equity investment.
AnorTech retains ownership of its assets and technology.
GreenlandMinesRecent developments / 2026New capital, completed fieldwork and a larger strategic investment support the next phase of the company’s development.
Reported financing supports the next technical programs. It is a historical proceeds figure, not current cash.
Skaergaard delivered 4,480 m of drilling in 17 completed holes and more than 100 tonnes of bulk material.
European trading access expands. Nasdaq remains the principal market.
The transaction closes, bringing ownership to approximately 19.9%. The November 9 release confirms the completed position.

GreenlandMinesGreenland / The strategic settingGreenland sits between Europe and North America. Its established security role and mineral potential place it within a shared strategic conversation.
Missile warning, missile defense, and space surveillance: existing missions that illustrate Greenland’s North Atlantic importance.
+Parliament approved the trilateral security agreement with seven abstentions. Danish parliamentary consideration remained ahead at the company’s update.
+Industrial resilience also depends on resources, processing, and trusted partners.+
Agreement signed September 22, 2026. Status reflects the November 4 disclosure. Strategic context does not establish a government award, defense contract or project approval for Greenland Mines.
GreenlandMinesRare-earth supply / China · 2024More diverse mineral sources are part of the answer. Resilient supply also requires separation, refining, and magnet manufacturing capacity.
Extracting magnet rare-earth minerals.
Separating and refining them into usable materials.
Manufacturing sintered permanent magnets.
Source: IEA, 2024 data. Mining and refining cover magnet rare earths Nd, Pr, Dy, and Tb. Magnet manufacturing measures sintered permanent magnet production. Each figure measures a separate stage; the percentages are not additive.
GreenlandMinesNorth Atlantic Critical Metals Corridor / Company strategyGreenland’s mineral potential sits between two major industrial markets. The North Atlantic Critical Metals Corridor is Greenland Mines’ strategy for developing that opportunity with trusted partners across Europe and North America, while creating lasting value in Greenland.
Sarfartoq provides the magnet rare-earth resource base; Skaergaard adds palladium, platinum, and gold. Technical programs are focused on resource evaluation, metal recovery, and the studies needed to advance development.
+Neo’s shareholding and Sarfartoq offtake negotiation MOU provide an existing commercial relationship with a European processor. The next work is to establish how future project material can meet processing requirements and agree definitive supply terms.
+Industrial customers need material that meets defined specifications and can be delivered reliably. Product qualification, logistics, and customer agreements are essential to turning a mineral resource into a commercial supply route.
+Infrastructure Technology Capital Greenlandic participation
Development strategy, subject to technical results, approvals, financing, and commercial agreements. Neither project has a production decision; EU Strategic Project status applies to Neo’s Silmet 2.0.
GreenlandMinesThe project atlas / GreenlandSarfartoq’s rare-earth carbonatite lies in southwest Greenland. Skaergaard’s palladium–gold–platinum intrusion lies on the southeast coast.
Magnet rare earths in a carbonatite complex. 100% company interest. Neo retains an offtake negotiation MOU.
66.520° N · 51.350° WPalladium, gold, and platinum in a layered intrusion. Greenland Mines holds 80%, with an option for the remaining 20%.
68.182° N · 31.669° W
GreenlandMinesThe work already behind the projectsDecades of exploration and research underpin the next phase. Select a project to trace its history.
93 historical diamond drill holes
1989–2021
Pioneering studies began a long international research record.
Successive owners added drilling, metallurgy and a 2008 scoping study.
Updated resources, then 4,480 m of new drilling in 17 holes.
94 holes supporting the
July 2026 ST1 estimate
Survey work established the carbonatite complex and its mineral potential.
Hudson’s drilling and testwork supported the historical 2011 assessment.
Renewed drilling and testwork, updated evaluation, then Greenland Mines’ acquisition.
Sarfartoq’s full project database: 161 holes / 35,843 m. The ST1 estimate uses the 94-hole subset above.
Selected milestones; intervals are not to scale. Historical studies provide context, not current economic conclusions. Resources are not reserves.
GreenlandMines02 / SarfartoqAt 1.60% TREO
+At 0.96% TREO
+ST1 · Hybrid scenario · Effective July 31, 2026.
TREO: total rare-earth oxides.3
Strategic shareholder with rights to up to 60% of future ore or mineral concentrate, creating a potential connection to European processing.3
Geological mapping, outcrop surveys, and rock sampling. Assays were pending at the September 24, 2026 update.4
Planned infill drilling, pilot metallurgy, engineering, and environmental studies will support the work toward pre-feasibility.3
SarfartoqA defined resource. A focused program.
GreenlandMinesSarfartoq / Neo Performance MaterialsNorth Atlantic context · Processing and market connections
+Under an MOU, Neo has the right to negotiate a definitive offtake agreement for this potential future output. Neo is also a shareholder and operates Silmet in Estonia.
Definitive offtake terms, processing compatibility, and future supply remain to be established.
+The plan adapts Neo’s Estonian facility for new raw-material sources. EU Strategic Project status, awarded October 9, 2026, applies to Silmet 2.0. Sarfartoq is a potential future feedstock source.
+
GreenlandMinesSarfartoq / Initial AssessmentThe nine-year base-case model estimates US$409m of initial capital and US$673m over the life of mine. These preliminary project costs are separate from funding for current technical programs.
| After-tax NPV₈ · US$m | 897 | 1,502 |
|---|---|---|
| Pre-tax IRR | 68.7% | 118.6% |
| After-tax NPV₈ · US$m | 605 | 1,074 |
|---|---|---|
| Pre-tax IRR | 66.0% | 117.5% |
High-case assumptions: prices +15%, operating costs −15%, and capital costs −20% versus base. Low-case pre-tax NPV₈: US$401m including Inferred / US$209m excluding Inferred. NPV is discounted project cash flow, not company value.
Preliminary assessment, not a feasibility study. No mineral reserves. Resources do not demonstrate economic viability. Inferred material has greater geological uncertainty; there is no certainty it will be upgraded or that assessment results will be realized.
GreenlandMinesSarfartoq / Development programA preliminary Initial Assessment and updated resource provide the starting point for the next phase of Sarfartoq’s development studies.
Mapping and sampling add evidence to the resource model. Planned infill drilling aims to improve confidence for the next study stage.
+Pilot metallurgy will test recovery and concentrate characteristics. The results inform processing compatibility and the flowsheet.
+Infrastructure, environmental and engineering studies support pre-feasibility work, alongside regulatory and community engagement.
+Resource confidence, recovery, and engineering must be evaluated together. No production decision has been made.
Assays were pending at the September 24, 2026 update. Planned programs remain subject to technical results and approvals.
GreenlandMines01 / SkaergaardA large, layered intrusion with defined palladium, gold, and platinum resources. New field data and recovery studies build on that foundation.
Palladium equivalent
+Palladium equivalent
+100% project basis · Effective July 3, 2026 · 80% company interest.1
| Resource category | Metric tons | PdEq grade | Contained Pd / Au / Pt |
|---|---|---|---|
| Indicated | 153.6 Mt | 3.04 g/t | 7.57 / 3.19 / 0.60 Moz |
| Inferred | 177.5 Mt | 3.07 g/t | 7.75 / 4.28 / 0.60 Moz |
PdEq combines metals using the report’s price and recovery assumptions; it is not palladium alone.
GreenlandMinesSkaergaard / 2026 field programDiamond drilling
Completed holes
Bulk material collected
New drill data will inform resource evaluation. The July resource estimate predates this completed program.
+Bulk material supports planned GTK testwork in Finland to assess recoveries and the proposed processing route.
+Resource, metallurgy and engineering inputs will inform an Initial Assessment and the next development decision.
+The program also included geotechnical, LiDAR, geophysical and environmental baseline work. Potential vanadium, iron and gallium by-products remain under evaluation, with no economic credit assigned. No production decision.
GreenlandMinesAnorTech / Strategic equity investmentAnorTech’s Gronne Bjerg project hosts anorthosite, a plagioclase-rich rock being investigated for alumina and other industrial materials.
Approximately / Strategic equity investment
Closed November 6, 2026. The additional shares have a 60-month contractual lock-up. Greenland Mines issued 1,133,268 of its own common shares as consideration. AnorTech retains its assets and technology.
Laboratory research is moving toward pilot testing. Fifteen metric tons of anorthosite were shipped to Ontario for pilot preparation.
+Research pathways include refractory and printable cement applications. Technical work is needed to establish performance and economics.
+Earth-based simulants and construction-material research extend the material’s testing applications; no lunar deployment is established.
+
GreenlandMinesCorporate platform / CapitalRaised over the preceding week, according to the company’s financing announcement.
Capital raised is not a current cash balance.Xetra trading began October 19. Nasdaq remains the principal market.
The company stated that recent financing supports planned Sarfartoq and Skaergaard work through targeted 2027 milestones.
+Up to US$20m authorized on October 6. Purchases are discretionary and depend on liquidity, markets and project needs.
+Study funding is distinct from future mine financing. Development requires further technical work, approvals and capital.
+
GreenlandMinesLeadership / CorporateChief Executive Officer & Chairman
Company formation, commercialization and capital raising.Leads the corporate platform alongside the natural-resources team.
President
Economic geologist with 20+ years in European and Arctic resources.Greenland experience since 1998. Former GEUS senior research scientist.
Chief Financial Officer
20+ years in finance, investing and business development.Experience at Greenlight Capital, GE Capital and McKinsey. Harvard MBA; MIT engineering.
GreenlandMinesLeadership / Technical & GreenlandVice President, Exploration
25+ years of global exploration experience.Work includes Authier lithium and Caspiche copper-gold. Leads Skaergaard technical work.
Chief Geologist
Ph.D. research on the Skaergaard intrusion.Former GEUS mineral-intelligence leader with more than a dozen Greenland field seasons.
Country Manager, Logistics & Studies
30+ years living and working in Greenland.Arctic logistics, remote field campaigns and coordination of environmental and feasibility studies.
Permitting & Community Manager
Greenlandic executive based in Nuuk.Government liaison, regulatory engagement and relationships with Greenlandic communities.
GreenlandMinesThe next chapterThe next results should improve the evidence for development and commercial decisions. These are the questions investors can follow.
Next evidenceAssay integration, infill drilling and scaled metallurgical testwork.
Decision informedDefine recovery, product quality and the engineering basis for pre-feasibility.
+Next evidenceDrill-data evaluation, GTK recovery testwork and an Initial Assessment.
Decision informedAssess resource confidence, processing choices and preliminary project economics.
+Next evidenceProcessing compatibility, product qualification and definitive supply terms.
Decision informedAssess a workable route from Greenland resources to industrial customers.
+Next-stage objectives; completion dates have not been announced. Advancement depends on technical results, approvals, funding, and execution.
GreenlandMinesAppendix / Material applicationsPermanent magnets can deliver compact power in electric motors. Not all electric-drive designs use rare-earth magnets.
Sarfartoq / Magnet rare earthsCatalytic surfaces help convert harmful exhaust gases. This application is associated with combustion engines.
Skaergaard / Palladium & platinumGold-plated contact surfaces resist corrosion in demanding electronic and aircraft connector applications.
Skaergaard / GoldApplication context, including aerospace and defense, not company products, customers, or current supply. Designs and material specifications vary; not all electric motors use rare earths.
GreenlandMinesTechnical notes / Investor informationMineral resources do not demonstrate economic viability. Inferred material has greater geological uncertainty than Indicated material. Categories are reported separately; equivalent-metal figures are not payable metal or production forecasts.
SLR Technical Report Summary, July 13, 2026; resource effective July 3, 2026. Resource figures are on a 100% project basis; company interest is 80% plus an option for the balance. PdEq = Pd + 2.258 × Au + 1.048 × Pt (g/t).
Hybrid open-pit / underground scenario, effective July 31, 2026. GeoSim / Tetra Tech Mineral Resource Estimate. TREO means total rare-earth oxides. Agricola’s 2026 Initial Assessment is preliminary; see its scenarios, assumptions, and cautions.
Future studies, supply arrangements, processing routes, transactions, and production depend on results, approvals, counterparties, market conditions, financing, and execution. No production decision is implied for either principal project.
Gold US$3,500/oz; palladium US$1,725/oz; platinum US$2,100/oz. Recoveries: Au 89%, Pd 86%, Pt 80%; NSR cut-off US$84/t. These assumptions belong to the July resource estimate, not a valuation or price forecast.
Material uses do not establish company products, manufacturers, customers, or government endorsement. AnorTech owns its assets and technology. NASA landscapes are geographic context; company project photos retain their original context.
GreenlandMinesAppendix / Supporting recordEach title links to the underlying source. Later disclosures supersede earlier transaction status. Technical assumptions and development cautions appear on the preceding page.